With the actual property expenses touching a brand new high, residents in old buildings at the moment are coming across that they've an opportunity to release sizeable cost from their property by using presenting it to a builder/developer for redevelopment. builders, on their element, also are in search of homes with unused development rights where they could build a brand new structure of a few storeys higher and sell those additional apartments for a tidy profit for them. at the same time as it could sound like a normal 'win-win' situation, the procedure of redevelopment isn't as easy because it sounds. It comes with a set of rules, techniques and implications that you need to apprehend.

it is pointless to say right here that the Redevelopment of housing societies is normally careworn with bitterness and court cases of high-handedness and corruption towards the coping with Committee. hence, in an effort to make sure transparency in societies in search of to undertake redevelopment tasks, the country Co-Operative department has, for the primary time, issued suggestions for societies to comply with underneath segment seventy nine (A) of the Maharashtra Co-operatives act, 1960.
The current tips are issued by way of a committee comprising the co-operatives commissioner and CIDCO chairman pursuant to a deep examine of proceedings via members of Housing Societies task the redevelopment of their property. in keeping with an important characteristic within the hints, a redevelopment scheme needs to be approved via the overall body best if three-fourths of the society participants are present at the assembly.

The issue of redevelopment has assumed exquisite significance due to the fact in Mumbai, majority of the homes owned through the Co-Operative Housing Societies are pretty old and in a dilapidated country. In case of redevelopment of vintage buildings which have finished 30 years or are beyond repairs as licensed via the govt.. authorized architect on the idea of his "Structural Audit".

the primary and the foremost step before getting into for redevelopment might be a structural audit of the constructing. The structural audit document will decide whether the building need to go in for redevelopment or for foremost upkeep. inside the absence of the technical report it'd not be legally permissible to bypass a resolution in the fashionable frame assembly. however, it is a reality that many co-operative societies unexpectedly call for popular body meeting and determine to move in for redevelopment inside the absence of a structural audit record.

There are  important matters in a Resident/Developer arrangement. One is from the industrial perspective and another is from the technical perspective. A Developer typically assures a positive sum of money by means of way of corpus, an additional place or a mix of each. He may also provide an opportunity lodging on your transient stay, foot your rentals or come up with a monthly reimbursement within which you need to discover your temporary lodging.

before you negotiate with a Developer, you want to establish the marketplace value of the belongings you may get hold of on of entirety of redevelopment. this is a better method than quoting a random parent to the builder that could cause them to sense brief-modified or the high amount could make the builder shy on the new project.

The technical angle refers to the completed proper. Does it suit the best and phrases and situations confident through the builder? In fact, on the settlement level itself, the society citizens must appoint a lawyer to draft and finalize the agreement. It normally takes a yr for a builder to convince the society members and take an in-precept approval. The society participants must make sure the timely of entirety of the project that's the maximum important detail to be mentioned inside the settlement.

the principle parties worried in the any redevelopment mission are Society and Developer. Committee contributors dealing on behalf of cooperative housing society are in most cases non-technical and are laymen.

therefore it's miles very important that the drafting of the smooth / agreement is finished meticulously so that there is no hazard of dispute and/or distinction between each the parties. notable abilities and vast criminal & Technical know-how is required to draft such an critical report. it is very critical to avail the services of a expert, who is legally in addition to technically qualified and someone who has the vision to assume destiny problems and requirements.
In any scheme of redevelopment, the number one objective is to make certain assure of overall performance. performance is mainly in the place of timely production, satisfactory manipulate and adherence to guidelines, and guidelines.

The excellent manner to pick out the builder is to ask sealed tenders thru a public word and such tenders ought to have the fundamental eligibility standards referred to. this could convey in extra transparency in selecting the developer. short info and advantages of the tendering process are given underneath.

quick detail OF TENDERING
- practise of smooth document including Technical, commercial and legal situations, distinctive specs and provide and so on
- advertisement in three local information paper
- promoting smooth documents
- identity of Developer and evaluation of gives and recommendation
- guidance in Negotiation
- Formation of suitable agreement

blessings OF TENDERING

- As commercial is given in 3 distinguished newspapers society gets accurate offers from reputed developers.
- As offers are invited in a sealed tender shape, there is a severe opposition some of the bidders.
- As all of the specs and terms and conditions are same for all the bidders, it turns into easy for assessment and assessment.
- Earnest cash Deposit in the form of PAY ORDER payable to the society is taken from each and each bidder so that undesirable or non involved events do now not bid for the paintings
- Mode of measurement of carpet vicinity and man or woman who will certify the identical is absolutely described.
- complete redevelopment inspiration to be accomplished in society's name making it safer for society in case of any problems confronted through developer.
- proper to change and or cast off developer remains with the society.
- As all of the details relating industrial phrases such as bank assure, temporary accommodation, cost of extra area and many others is sincerely described the possibilities of ambiguity and disputes are in reality non-existent.
- distinctive technical technique of labor is laid out within the soft report underneath the pinnacle of technical specification.
- fundamental costs are referred to in the tender file permitting individuals to alternate any specification for their individual makes use of.
- right to check amendments of plans during the development of labor is kept with the society.
- cloth to be used is spelt out with emblem names to keep away from any confusion.
- As all of the objects are defined absolutely the probabilities of having realistic offer are wonderful.
- effects of delay are described in gentle record.
- gentle is a legally binding record.
- Bye law No 158 recommends need of soft document for production of building.

After a right feasibility document is submitted, the following step in the method of Redevelopment of any society is the most critical one, viz: choice of the best DEVELOPER, who will meet all of the needs of the society, and on the equal time be financially solid, and having a number of enjoy of Redevelopment because unrealistic gives can often cause redevelopment initiatives being stalled and go away citizens in a restoration.

this is achieved by the method of tendering, in which the project control consultant will waft a soft record containing all the criminal, Technical, and industrial & different vital terms & situations, whereby most protection of the society individuals is ensured, as they're parting with their lifestyles's maximum valuable possession.... their residence, within the hands of an ideal stranger.

earlier than we comply with re-development plan, please read carefully, the procedural elements are strictly followed as in step with the govt. hints on the conferences of the Society.

The government of Maharashtra has issued a round bearing No. CHS 2007/CR554/14-C, Co-operation, marketing and Textiles branch Date: 3rd January 2009 which incorporates a Directive underneath phase seventy nine(A) of Maharashtra Co-operative Societies Act 1960 for all the Co-operative Housing Societies within the state of Maharashtra regarding the Redevelopment of buildings of Co-operative Housing Societies that anyplace, the homes of Co-operative Housing Societies within the kingdom of Maharashtra are being redeveloped on a big scale, some of proceedings were acquired from contributors towards managements of Co-operative Societies in which redevelopment is taking place. In admire of maximum of the Co-operative Housing societies, nature of complaints referring to redevelopment is as underneath:-

1. not taking the contributors in self assurance within the process of redevelopment.

2. there may be no transparency in smooth system.

three. Appointing contractors arbitrarily.

4. To work by using violating provisions of Co-operative Act, rules and Bye-legal guidelines.

five. No orderliness in the paintings of Architect and task consultant.

6. now not planning Redevelopment undertaking document.

7. not adopting right method in finalizing tenders.

whereas there's no concrete policy in appreciate of all above factors of complaint and therefore Co-operation Commissioner and Registrar, Co-operative Societies, Maharashtra nation, Pune had appointed a look at institution under the Chairmanship of Joint Registrar, Co-operative Societies (CIDCO) to examine the court cases acquired at numerous degrees and for consultations with all components working within the relevant fields. The stated look at group has expressed the opinion that it's far critical to frame regulations for redevelopment of homes of Co-operative Housing Societies after consultation with all of the ingredients within the discipline of Co-operative Housing.

Directive for Redevelopment of constructing of Co-operative Housing Society

1. Requisition for convening special trendy frame meeting for Redevelopment of Society's constructing:-

no longer much less that ¼ members of the Society the constructing of which is to be redeveloped must submit a requisition to Secretary at the dealing with Committee elected as in step with provisions of Bye-laws and lawfully formed together with their scheme and tips for redevelopment of the Society's constructing for convening special standard frame assembly to finalize the coverage on redevelopment of the constructing.

2. Convening unique fashionable body assembly:-

On receipt of an application as in line with Directive No. 1 above, managing Committee need to take a word thereof within 8 days and Secretary of the society must convene wellknown body meeting of all of the members of the society, agenda of the meeting must be provided to every member 14 days prior to the day of meeting and acknowledgement thereof have to be stored on document of the society.

earlier than convening the said meeting, Society must acquire list of Architects / task control experts on the panel of government / local Authority and achieve quotations from minimum 5 experienced and expert individuals for preparing mission report for redevelopment paintings of the constructing and one expert character from among them may be decided on within the special preferred body assembly.

Following business might be transacted inside the said special wellknown body meeting:-

1. To take initial selection via taking into consideration demand of the contributors for redevelopment of society's building and tips received in appreciate of the identical.

2. To select expert and experienced Architect / mission control representative on the panel of the authorities / neighborhood Authority for paintings of redevelopment of the constructing and to finalize gadgets of work to be performed by using them and terms and conditions of labor.

3. To publish define of this system for redevelopment of the constructing.

three. to accept written guidelines from participants regarding redevelopment of the constructing:-

individuals of the Society may be entitled to post in writing to the committee 8 days previous to the meeting their realistic scheme, suggestions and pointers for redevelopment of the constructing in the call of skilled and expert Architect / undertaking control representative recognized to them. but, that Architect / mission control consultant should publish a letter that he's desirous of doing work of redevelopment.

4. decisions to be taken in the special preferred body assembly:-

Quorum for the unique widespread body meeting convened for redevelopment of building of the Co-operative Housing Society could be ¾ of the entire members of the society. If quorum isn't formed, meeting will be adjourned for eight days and if there may be no quorum for the adjourned meeting, it'll be deemed that members aren't interested by redevelopment of the constructing and assembly may be cancelled.

On formation of quorum for the meeting, recommendations, tips and objections from all of the contributors in regards to redevelopment of the society's building will be considered and opinions expressed through all of the members may be recorded in the minutes book with names of involved members. therefore a initial decision can be taken whether or not to redevelop society's building or now not. Such selection ought to be concerned about majority vote of greater than ¾ of the contributors. On initial decision approximately doing the work of redevelopment getting exceeded, following commercial enterprise will be transacted inside the assembly.

a) to chose expert and skilled Architect / venture control consultant

from the panel of the authorities / neighborhood Authority for paintings of redevelopment of the building and to finalize objects of labor to be performed by way of them and terms and conditions for the equal.

b) To put up an define of this system for redevelopment of constructing.

5. providing mins of meeting to all contributors:-

Secretary of the Society should prepare minutes of special wellknown body meeting as above inside ten days and a replica thereof must be furnished to all contributors and acknowledgement therefore be saved on document of the society. also one replica should be forwarded to the office of the Registrar.

6. Issuing Appointment Letter to the Architect / venture management consultant:-

Secretary of the society will within 15 days of the meeting issue Appointment Letter to the Architect / task management representative selected in special wellknown frame assembly and Society will input into an settlement with Architect / project management representative incorporating therein terms and situations approved in unique fashionable frame assembly.

7. paintings to be achieved inside the initial stage by means of Architect / venture management representative:-

a) To survey Society's building and land.

b) To obtain facts approximately conveyance of land to the society.

c) To take into consideration triumphing policy of the authorities and the regulations applicable on occasion depending on ownership of the land (MHADA/SRA/Municipal enterprise) and to acquire information approximately FSI and TDR, which could be to be had with regards to constructing and land of the society.

d) To think about recommendations and recommendations from the members for redevelopment of the constructing as additionally the residential location to be made available to the individuals, industrial area, vacant location, garden, parking, building specifications and so forth. and to prepare a realistic challenge file.

e) Architect / undertaking control representative ought to prepare the venture record inside  months of date of his appointment and to put up the identical to committee of the society.

eight. action to be taken on receipt of redevelopment assignment record:-

a) On receipt of Redevelopment assignment record as above, Secretary of the society will convene a joint assembly to approve the assignment file with majority vote via considering tips obtained from Committee individuals and Architect / mission management representative. be aware in that behalf can be published on the notice Board of the Society bringing up time venue etc. of the assembly.

b) It must be noted in the observe that a duplicate of the assignment file is available within the society's office for participants to look and the notice have to be served on all of the members that they need to publish their suggestions eight days prior to the subsequent Committee assembly and acknowledgement of such word must be stored on document of the Society.

c) Seven days prior to joint assembly, pointers acquired from the members will be forwarded by using Society's Secretary to the Architect / mission control representative for his information.

d) There can be a detailed dialogue in the Joint meeting on the hints / pointers from members and opinion thereon of the Architect / mission control consultant and assignment file may be accepted with essential modifications. Thereafter draft of smooth from might be prepared and date of subsequent joint assembly may be constant for discussion on draft smooth form and finalizing the same.

e) even as preparing draft soft form, in order to get aggressive quotations from famend experts and skilled Developer, either carpet vicinity or corpus fund constant (not to be modified) and by finalizing different technical subjects, the Architect / project management representative will invite tenders. Society's individuals may be entitled to supply records about it to the reputed and skilled Developer acknowledged to them.

nine. getting ready listing of Bids obtained:-

a) at the ultimate day for receiving quotations, Secretary of the Society will prepare a list of gives obtained and display the identical on the notice board of the society.

After 15 days of the last day for receiving quotations, Secretary of the society will convene special assembly of handling Committee of the society. authorized representatives of bidders and contributors of the society desirous of closing gift can continue to be present for the meeting as observers.

Tenders so acquired can be opened in the presence of all and the Architect / challenge management consultant will scrutinize all tenders and prepare a comparative chart and after checking merit, recognition, experience and comparative price etc. and pick out minimal five bids and if the bids received are much less than five, all the bids for putting up before unique widespread meeting and worried bidders could be informed about it right now.

10. selection of Developer:-

a) office of the Registrar to rent authorized officer for attending standard frame assembly:-

An utility with listing of the members need to be sent inside eight days to the registrar for appointment of authorized officer to attend the special preferred assembly of the Society for deciding on a Developer out of those selected by way of committee of the Society with the help of the consultant, through contemplating his revel in, merit, financial capability, technical capacity and aggressive price and many others.

b) Convening special trendy frame assembly for finalizing smooth:-

After appointment of legal officer, together with his prior permission Secretary of the Society will restoration the time and venue convene special widespread frame meeting for appointment of Developer and time table of this meeting might be despatched to all the members 14 days prior to the meeting by way of hand delivery and with the aid of registered submit and maintain acknowledgement thereof on document of the Society. also, office of the Registrar will make association to maintain his legal consultant present for the assembly.

additionally association could be made for video shooting of the meeting on the cost of the Society. Any person other than formal individuals will now not be entitled to attend this assembly. consequently individuals can be required to provide at the venue of the meeting with their identification cards. on the time of submitting redevelopment inspiration to the worried authority for sanctioning, selection of Developer and other paintings need to have been completed within the presence of authorized officer from Registrar's workplace.

c) If there's no quorum for unique popular frame assembly:-

If the quorum of ¾ members out of overall members is not formed for special popular frame meeting, the meeting will be adjourned for 8 days. If quorum does no longer get formed for adjourned meeting, it will be deemed that the members have no interest in redevelopment of the building and the assembly can be cancelled and thereafter the said subject will not be taken up before the unique general frame meeting for approval.

d) inside the special fashionable body meeting to be convened for choice of Developer, legal consultant from the office of the Registrar can be present and take a look at court cases of the assembly. also, on concerned representatives and licensed officer ultimate present on the venue and at the time of meeting and on quorum of ¾ contributors getting formed, following enterprise will be transacted in the meeting.

i) presenting comparative data in recognize of tenders decided on for presentation (for redevelopment paintings).

ii) Presentation by bidders separately.

iii) To pick Developer for redevelopment of the building, to finalize phrases and situations and finalize the tender.

iv) To attain consent from the chosen Developer.

v) supply statistics approximately in addition work. it is going to be important to take written approval through ¾ majority vote of the participants present for the meeting for choice of Developer. If the chosen Developer of his consultant does no longer continue to be gift for the meeting, further movement could be taken by using presuming that they have given their consent for the challenge.

11. settlement to be entered into with Developer:-

difficulty to the terms and conditions authorized by way of wellknown frame assembly of the Society, an settlement must be entered into with the Developer inside one month underneath steering from the Architect / mission control consultant. along side the points cautioned by means of the Architect / mission management consultant appointed via the Society, following points will also be covered inside the agreement.

(1) The length for finishing redevelopment assignment of the Society will now not exceed greater than two years and in first rate instances, it'll now not exceed 3 years.

(2) Developer will give a bank assure for amount same to 20% of the undertaking value.

(three) at some stage in the length of redevelopment, the Developer will make to be had to the individuals alternative lodging in the identical region as a long way as feasible or arrange to pay monthly hire and deposit as desirable to participants or make to be had transit camp lodging.

(four) The said settlement will be registered under Registration Act, 1908.

(five) On final touch of redevelopment venture, new participants can be admitted within the Society most effective with approval of popular frame meeting of the Society.

(6) Carpet place to be allocated have to be really stated in the agreement.

(7) development proper vested within the Developer will be non-transferable.

(8) participants will vacate their respective premises simplest in any case legal approvals are received for redevelopment of the constructing.

(9) Rights of folks who are in ownership of the flats will remain unaffected.

(10) If any dispute arises within the paintings of redevelopment, provision should be made within the settlement to remedy the same as in keeping with provisions of phase 91 of the Act.

(eleven) After receipt of profession certificate, residences within the redeveloped constructing must as far as feasible be allotted as in step with present conditions ground-smart and if it turns into necessary to allot flats with the aid of drawing plenty, on final touch of production, Developer have to make arrangement drawing plenty, and at that time flats need to be allotted inside the presence of Registrar's representative and this method be recorded by way of video shooting.

(12) Any Committee member or office Bearer of the Society ought to no longer be the Developer or relative of the Developer.

(13) constructing plans sanctioned with the aid of the Municipal business enterprise / competent Authority ought to be put up earlier than the overall frame assembly for facts and if any member desires copies of approved documents, he must submit utility for the identical to the Society and it will likely be binding at the Committee to furnish the data by charging necessary fee.

by way of order and in the call of the Governor of Maharashtra (Dr. Sudhirkumar Goyal) principal Secretary (Co-operation and marketing)

reproduction to:

1) Co-operation Commissioner and Registrar, Co-operative Societies, Maharashtra kingdom, Pune.

2) Divisional Joint Registrars, Co-operative Societies (All).

3) District Deputy Registrars, Co-operative Societies (All).

choose document (14-C).

Ref.: Z:00 - 5002 government CIRCULARS & court judgements 20082 government CIRCULARS 2007142 Directive for Redevelopment of building of Co-operative Housing Society [English] 03-01-2009.

A properly drafted consent of as a minimum 70% the Society individuals ought to be received in writing throughout the Society meetings whilst the difficulty of redevelopment is discussed. but, the minority members of co-operative housing society can't hinder a redevelopment project. On Jun 28, 2010, the Bombay excessive court docket has all over again dominated that members of a co-operative housing society who're in minority can not hinder a redevelopment challenge and have to abide with the aid of the general public decision of the society, until they display that here is a few prejudice brought about to them or a fraud has been committed.

In a latest ruling, the Bombay high court has stated that the problem of minority of tenants can't be an obstacle for redeveloping a belongings if minimum 70% of the tenants are ready for the identical.

The judgment got here in opposition to a depend of a redevelopment in Dadar where 17 members have been opposing the redevelopment of an vintage Parsi chawl. based on the writ petition filed by the institution of dissenting participants, Justice D.B.Bhosale granted the permission to BMC to forcibly evict the families with the police assist in case of any competition from the others against the redevelopment.

it's far important to word that as consistent with the phase 103B of Maharashtra Housing and vicinity improvement Act, 1976, with the recommendations for redevelopment of old Municipal properties by way of the Municipal Tenants Co-Operative Housing Societies on the land owned with the aid of the company under regulation 33(7) of the improvement imperative guidelines for more Bombay, 1991, it is vital that extra than 70% of the eligible existing Municipal tenants must provide written consent to redevelop the belongings underneath the scheme with a formation of a co- operative society / affiliation and an initiative thought for the redevelopment.

The court has held that after 70% or more occupants /tenants provide their consent for redevelopment with the aid of forming a co-operative body and if the scheme is accredited through the company, it is binding to all other occupants. As according to the recommendations, the tenants / occupants with separate stand, have no choice however to follow the norms. Being in minority (about 30% or less than that) the best preference for them stays is, to surrender their tenancy rights and quit from the scheme.

The special trendy body has to approve the bid of the a success bidder in a meeting attended by way of the registrar. The entire complaints must be video-recorded. as soon as the agreement is regularly occurring in terms of area and corpus fund, it can not be revised. The a success bidder has to give a bank assure equal to twenty% of the whole assignment cost to reveal his financial power, and evidence that he'll not throw away the assignment midway.

The Developer values the sort of Societies that either have some open plot of land or are willing to demolish the antique systems to reconstruct new homes. wherein such redevelopment is possible, Developer usually comply with pay some consideration through manner of Corpus Fund together with more region of their current apartments to the individuals and are looking for permission to assemble a constructing at the open plot of land or to assemble a new, larger building the use of the Transferable development right (TDR), floor area index (FSI) after demolishing the prevailing structure.

depending upon the provide from the Developer and next negotiations him, he both presents exchange residential flats to the contributors of the Society or pay rent in advance by means of way of post dated cheques, one month lease as brokerage and transportation charge and so forth. to relaxed an exchange accommodation till the brand new building is built and the participants are rehabilitated of their new flats. all the demands and negotiations ought to be carefully recorded within the 'development agreement' for successful execution of redevelopment in a housing society and the office bearers and the dealing with committee members have a strong role to play.

In any system of redevelopment, one should be aware about various documentations which can be required and additionally one should understand the tax implications on redevelopment of immovable belongings. The principal documents are 'development agreement' and 'strength of legal professional' which can be to be registered by way of paying suitable stamp duty.

by means of executing the development settlement' with the Society, the Developer gets the required permission to broaden the land and submits the papers to involved civic government. Upon diverse sanctions available to him, the Developer constructs the buildings at his value, retains a few apartments for him to be bought in the open marketplace and earn earnings.

it's far crucial for a Society to have a valid conveyance of land and building in its want for it to be redeveloped at a later date and that consists of obtaining marketable identify, permission for reconstruction and creation of extra floors via use of TDR and FSI, or else, Society may not get any approval of plan from Municipal corporation. but due to our lack of knowledge, majority of builders fail to bring the identify to a Co-Operative Society after the residences first of all constructed on a plot of land.

In truth, the extra majority of the Co-Operative Housing Societies, fashioned in Mumbai within the ultimate two decades, do no longer have the land conveyed in their choose which results inside the Developer or the earlier proprietor maintains to stay the proprietor of the assets. This outcomes in a scenario where these Societies have simplest possessor rights and no longer the ownership rights over the land, depriving them of the additional TDR FSI that is the principle driving pressure for getting into such redevelopment agreements whilst required at a later date.

The challenge of great completion of redevelopment of any Housing Society and to get returned their members in their dream houses isn't always hard supplied the workplace Bearers and the Committee contributors are sincere and justify their respective posts in the welfare and properly being of the contributors of the Society.